Belco

Highest level of expertise

Belco offers global capabilities and experience in infrastructure, commercial electrical contracting and renewable energy and provides the highest level of expertise to the U.S. market

Projects

Commercial electrical contractor

Now Belco offers the regional expertise of Belco coupled with the global experience and financial capabilities of Elecnor
iStock-185121475.jpg


People

The people’s sense of belonging, talent, initiative and energy make the company continue its growth in a sustainable and profitable manner, affording its customers comprehensive, innovative and competitive solutions with high added value.

Infraestructuras.jpg

Elecnor Group

With 60 years of continuous growth and a presence in more than 50 countries, Elecnor has become one of the most outstanding Spanish business groups and a benchmark in the infrastructure, renewable energy and technology sectors

Nogales St. Grade Separation

Alameda Corridor-Eat Authority (ACE) constructed a six-lane roadway underpass and double-track railway bridge to completely grade separate Nogales Street with the railroad (Los Angeles Subdivision) between San Jose Avenue and Gale Avenue/Walnut Drive North in the Cities of Rowland Heights and Industry. Gale Avenue and Walnut Drive North near Nogales Street was widened to two lanes in each direction to ease a traffic chokepoint.  Construction of the Nogales Street Grade Separation began in May 2013. With the completion of the temporary railroad crossing at Charlie Road, Nogales Street between San Jose Avenue and Gale Avenue/ Walnut Drive North was closed in March 2014 for underpass and bridge construction. Nogales Street re-opened to traffic in June 2016.  The project included work at (8) traffic signal intersections.

Belco provided full service electrical installation of the traffic signal and street lighting systems.

Lakeview Blvd. Pedestrian Bridge Overcrossing

Orange County Transportation Authority (OCTA) reconstructed Lakeview Avenue as an overcrossing to allow vehicles to pass over the BNSF Railway tracks. Lakeview Avenue was elevated and realigned to separate car traffic from train traffic. The overpass was built between south of Orchard Drive to the north and south of Eisenhower Circle to the south.

A ramp connecting Lakeview Avenue to Orangethorpe Avenue was also constructed, and North Bubach Street on the northeast corner of the project area was rerouted to connect to the new Connector Road with a new signalized intersection. In addition, a new frontage road was built at the southeast corner of the project for local business access and a new road also was built at the southwest corner, which connects the new frontage road to Lakeview Avenue.

Belco provided the temporary and permanent traffic signal and street lighting systems, bridge and underpass lighting and fiber optic systems for this project.

Lakeview Ave. Grade Separation

Orange County Transportation Authority (OCTA) reconstructed Lakeview Avenue as an overcrossing to allow vehicles to pass over the BNSF Railway tracks. Lakeview Avenue was elevated and realigned to separate car traffic from train traffic. The overpass was built between south of Orchard Drive to the north and south of Eisenhower Circle to the south.

A ramp connecting Lakeview Avenue to Orangethorpe Avenue was also constructed, and North Bubach Street on the northeast corner of the project area was rerouted to connect to the new Connector Road with a new signalized intersection. In addition, a new frontage road was built at the southeast corner of the project for local business access and a new road also was built at the southwest corner, which connects the new frontage road to Lakeview Avenue.

Belco provided the temporary and permanent traffic signal and street lighting systems, bridge and underpass lighting and fiber optic systems for this project.

Long Beach Rainbow Bridge

The Rainbow Bridge connecting the Promenade side of the Long Beach Convention and Entertainment Center to the Terrace Plaza is officially complete. The 605-foot elevated pedestrian walkway in downtown Long Beach, with its LED lights and wave-like arched canopy. The Rainbow Bridge is more than a walkway—it is a functional piece of art!”.

At night, the bridge’s arched canopy will show colorful waves of programmable LED lights “cresting” above pedestrians’ heads. With 3,500 LED lights, 100 downlights and 70 floodlights, the walkway will serve as an eye-catching illumination near the downtown waterfront. Other features include bench seating alongside California native foliage and landscaping, and a place for visitors and residents alike to catch a great view of the city.

Belco provided design assistance and full-service electrical installation for this project.

Long Beach Rainbow Bridge

Kaiser Solar Project

Kaiser continues its tradition of providing wellness inside and outside its facilities with the installation of the solar PV covered parking structure at its Anaheim Medical Center. Belco provided design, engineering and installation of the 276 kW system. 

The PV system consists of 4 carport structures that provide shade as well as renewable energy. 1176 modules were installed at a 5 degrees tilt facing South-East.  

Energy Produced: Number of trees: 76,923
Carbon Equivalents: Number of miles driven: 1,821,096
Surface equal to 8 football fields

Kaiser Solar Project

Elecnor Group’s first solar photovoltaic power plant in the United States

Elecnor completed the design, engineering and installation of the 20-megawatt Guernsey PG&E PV solar project

Elecnor Group’s first solar photovoltaic power plant in the United States
Close